REVERSE OF PART II
Advised
| Cask, Drum or Package No. | Registered capacity in B.L. | Actual Contents | Thermometer indication | Hydrometer indication |
|---|---|---|---|---|
| (1) | (2) | (3) | (4) | (5) |
Received
| Strength in bulk litres | Proof litres | Actual Contents | Thermometer indication | Hydrometer indication |
|---|---|---|---|---|
| (6) | (7) | (8) | (9) | (10) |
| Strength loss in transit | Proof litres in transit | Proof litres | Proof litres | Increase | Remarks |
|---|---|---|---|---|---|
| (11) | (12) | (13) | (14) | (15) |
Forwarded to the Officer–in–charge of the Bonded Manufactory at columns (1) to (7) having been duly filled in.
Dated ........................... 20 ___ .... Distillery Officer
Returned to the Distillery Officer. Columns (8) to (15) having been duly filled in.
Dated 20-------- Officer-in-charge, Manufactory.