अधीक्षक, राज्य उत्पादन शुल्क, हिंगोली यांच्या कार्यालयाची इमारत बांधकाम करण्यासाठी प्रशासकीय मान्यता प्रदान करणेबाबत........

Reference
202102181809167329
Issued
15 Feb 2021
Source
GR Portal (Home Dept - State Excise)
Category
Gr Home Dept

What This Document Says

MAHARASHTRA EXCISE DEPARTMENT — GOVERNMENT RESOLUTION ANALYSIS

Document Type: Government Resolution (GR) — Administrative Approval for Capital Works

Reference Number: GR No. BGT-1021/Pr.Cr.23/RAUSU-1, dated 15 February 2021

Issued By: Government of Maharashtra, Home Department (गृह विभाग), on behalf of the Governor of Maharashtra

Effective Date: 15 February 2021 (Date of Government Resolution)

Summary:

This Government Resolution grants administrative approval for the construction of a new office building for the Superintendent, State Excise Department, Hingoli, at a total sanctioned cost of ₹7,15,20,472 (Seven Crores Fifteen Lakhs Twenty Thousand Four Hundred Seventy-Two). The project encompasses construction of a two-storey office building (1,073.50 sq.m built-up area) with ancillary infrastructure including water supply, sanitation, electrical works, rain-water harvesting, solar rooftop installation, and parking facilities on a 0.40 acre plot (Survey No. 100) located within Hingoli Municipal Council limits. The expenditure is authorized to be met from the capital works budget head "4059 — Public Works Capital Expenditure, (15) Excise and State Excise, (15)(01) Major Works (Programme) (4059-1033)." Financial approval was obtained from the Finance Department vide Informal Reference No. 92/2021/Exp-8, dated 15.02.2021.


KEY PROVISIONS:

Project Location: Plot at Survey No. 100, 0.40 acre, in the name of Hingoli Municipal Council, earmarked for State Excise Office, Hingoli, Hingoli Taluka, Hingoli District, Maharashtra

Sanctioned Total Cost: ₹7,15,20,472 (Seven Crores Fifteen Lakhs Twenty Thousand Four Hundred Seventy-Two rupees only)

Beneficiary Department: Office of the Superintendent, State Excise Department, Hingoli

Budget Head/Fund Source: Demand No. H-8, Major Head "4059 — Public Works Capital Expenditure, Sub-head (15) Excise and State Excise, Sub-sub-head (15)(01) Major Works (Programme), Code 4059-1033 — Major Works"

Financial Sanction: Issued in accordance with Finance Department informal sanction Ref. No. 92/2021/Exp-8, dated 1 December 2020

Date of GR Issue: 15 February 2021

Computer Code/Portal Reference: 202102181809167329 (Maharashtra Government Portal: www.maharashtra.gov.in)

Digitally Signed: Yes, signed electronically by Shashank R. Sawant, Section Officer, Government of Maharashtra


PROJECT COST BREAKDOWN (as per Recapitulation Sheet):

Section A: ESSENTIAL ITEMS (COMPONENTS)

Item Quantity/Unit Rate Total Cost (₹)
Building Proper (Built-Up Area 1,073.50 sq.m)
Ground Floor 536.75 sq.m 33,700.00/sq.m 18,088,475.00
First Floor 536.75 sq.m 27,000.00/sq.m 14,492,250.00
Subtotal (1a) 32,580,725.00
Fuel Gas Pipeline 0.00
Bio-Digester 0.00
Rain/Roof Water Harvesting 536.75 sq.m 600.00/sq.m 322,050.00
Solar Rooftop (MoU to be executed) Lump sum 500,000.00
Ramp for Handicaps 0.00
Furniture 500 sq.m 5,000.00/sq.m 2,500,000.00
Subtotal (1b+c+d+e+f+g) 3,322,050.00
Water Supply and Sanitary Works 5% of 1(a) 1,629,036.00
Electrification:
Internal 5% of 1(a) 1,629,036.00
External 6% of 1(a) 1,954,844.00
Fire Fighting Arrangements etc. 7% of 1(a) 2,280,651.00
Subtotal (3) 5,864,531.00
SUBTOTAL (A) — ESSENTIAL ITEMS ₹43,396,342.00

Section B: MISCELLANEOUS ITEMS

Item Quantity/Unit Rate Total Cost (₹)
Compound Wall and Gate 328 Rgm (82m × 4m) 12,000.00/Rgm 3,936,000.00
Internal CC Road (as per layout) 1,375 sq.m (250m × 5.50m) 3,300.00/sq.m 4,537,500.00
Development of Ground Lump sum 200,000.00
Parking Arrangement (Two-wheeler and Four-wheeler) 100 spaces 12,000.00 1,200,000.00
Retaining Wall 0.00
Land Scaping Lump sum 200,000.00
Soil Investigation & Detail Land Survey Lump sum 200,000.00
CC Drain (250m × 2 Rgm) 500 Rgm 2,500.00/Rgm 1,250,000.00
SUBTOTAL (B) — MISCELLANEOUS ITEMS ₹11,523,500.00

Section C: OPTIONAL ITEMS

Item Cost (₹)
Underground Water Tank for RWH 200,000.00
Water Main Storage & Pump House, Borewell etc. 500,000.00
Air Conditioning 300,000.00
Lifts 0.00
External Toilets 0.00
AB Rooms, Area Lighting, Pumps, Generator 300,000.00
CCTV 0.00
SUBTOTAL (C) — OPTIONAL ITEMS ₹1,300,000.00

Section D: PROVISIONS (CONTINGENCIES, GREEN BUILDING, GST, PRICE ESCALATION)

Item Percentage/Amount Cost (₹)
Contingencies 4% of (A) 1,735,853.68
Green Building 5% of (A) 2,169,817.10
GST @ 12% 12% on Project Cost (P) 6,746,380.64
Price Escalation 10% on Project Cost (P) 5,621,984.00
SUBTOTAL (D) ₹15,300,630.00 (approximately, as shown)

Note: The recapitulation sheet shows minor computational variations; the GR sanctions the final total of ₹7,15,20,472 (₹71,520,472).


PLINTH AREA RATES (For Reference/Benchmarking)

Description Rate
Building Proper Cost ₹30,350.00/sq.m
Electrical Work ₹5,463.00/sq.m
Water Supply ₹1,517.50/sq.m
Combined (i)+(ii)+(iii) ₹37,330.50/sq.m
Total Project Cost per sq.m (TPC/Area) ₹66,623.63/sq.m

WHO IS AFFECTED:

Primary Beneficiary: State Excise Department, Hingoli

Implementing Authority: Superintendent, State Excise Department, Hingoli; Public Works Department (Building Division), Hingoli

Oversight/Approval Bodies:

  • Commissioner of State Excise, Maharashtra State
  • Chief Engineer, Public Works Regional Division, Aurangabad
  • Executive Engineer, Public Works Department, Hingoli
  • Comptroller and Auditor General of India (CAG) — Maharashtra
  • Principal Secretary, State Excise Department

IMPORTANT NOTES / CONDITIONS / APPROVALS:

No Excise License Type Affected: This is a capital works sanction for office building construction, not affecting FL-I, FL-II, FL-III, FL-IV, CL-I, CL-II, CL-III, Toddy, or Neera licenses.

Referenced Supporting Documents:

  1. Letter from Commissioner (Administration), State Excise Department, Mumbai — Ref. BLD-112020/19405/Sinha, dated 18.01.2021
  2. Letter from Executive Engineer, Public Works Department, Hingoli — Ref. Prasha Ima 4024/Andaj Patrake, dated 19.11.2020
  3. Finance Department GR Corrigendum — Ref. ArnSan-2020/Pr.Cr.65/Arn-3, dated 1.12.2020

Financial Sanction Basis: Finance Department Informal Reference No. 92/2021/Exp-8, dated 15.02.2021

Key Condition: Solar Rooftop installation (₹5,00,000) is contingent upon execution of a Memorandum of Understanding (MoU)

Execution Authority: The sanction is issued on behalf of the Governor of Maharashtra in accordance with established administrative procedures

Digital Authentication: GR is issued with digital signature authentication; Computer Portal Code: 202102181809167329; accessible on www.maharashtra.gov.in

Distribution of GR (Copies Issued To):

  1. Private Secretary to Minister of State Excise
  2. Private Secretary to Minister of State (State Excise)
  3. Principal Secretary to the Principal Secretary, State Excise Department
  4. Comptroller and Auditor General — Maharashtra (Audit/Accounts and Admissibility)
  5. Commissioner, State Excise, Maharashtra
  6. Public Works Department, Building Section-2, Ministry, Mumbai
  7. Chief Engineer, Public Works Regional Division, Aurangabad
  8. Executive Engineer, Public Works Department, Hingoli
  9. Section Officer, Home Department, Ministry, Mumbai
  10. File/Case Management Officer, State Excise Department, Home Department, Ministry, Mumbai

TECHNICAL SPECIFICATIONS (as per Project Estimate):

Plot Area: 0.40 acre (Survey No. 100, Hingoli Municipal Council)

Built-Up Area: 1,073.50 sq.m (Ground Floor: 536.75 sq.m + First Floor: 536.75 sq.m)

Parking: 100 spaces (Two-wheeler and Four-wheeler)

Utilities & Sustainability Features:

  • Solar Rooftop Installation (₹5,00,000)
  • Rain-Water Harvesting System (536.75 sq.m coverage, ₹3,22,050)
  • Underground Water Tank (Optional, ₹2,00,000)
  • Water Main Storage & Pump House with Borewell (Optional, ₹5,00,000)
  • Air Conditioning System (Optional, ₹3,00,000)
  • CCTV System (Optional, ₹0 allocated)
  • Ramp for Handicap Accessibility (₹0 allocated but provision made)

Electrical & Safety:

  • Internal Electrification (5% contingency: ₹16,29,036)
  • External Electrification (6% contingency: ₹19,54,844)
  • Fire Fighting Arrangements (7% contingency: ₹22,80,651)
  • AB Rooms, Area Lighting, Pumps, Generator (Optional, ₹3,00,000)

Infrastructure & Development:

  • CC (Cement Concrete) Internal Roads: 1,375 sq.m
  • CC Drainage: 500 Rgm (250m × 2)
  • Compound Wall & Gate: 328 Rgm (82m × 4m)
  • Land Scaping: Lump sum ₹2,00,000
  • Soil Investigation & Land Survey: ₹2,00,000

Furniture & Fittings: ₹25,00,000 (500 sq.m @ ₹5,000/sq.m)


APPROVAL CHAIN & DATES:

Event Date Reference
Commissioner (Admin) request for administrative approval 18.01.2021 BLD-112020/19405/Sinha
Executive Engineer cost estimate submitted 19.11.2020 Prasha Ima 4024/Andaj Patrake
Finance Department informal sanction 01.12.2020 ArnSan-2020/Pr.Cr.65/Arn-3
Finance Department formal sanction 15.02.2021 92/2021/Exp-8
Government Resolution Issued 15.02.2021 BGT-1021/Pr.Cr.23/RAUSU-1
GR Published on Maharashtra Portal 18.02.2021 Computer Code: 202102181809167329

FISCAL IMPACT:

Total Sanctioned Expenditure: ₹7,15,20,472 (Seven Crores Fifteen Lakhs Twenty Thousand Four Hundred Seventy-Two) rupees

Fund Allocated From: Capital Works Budget Head 4059 (Public Works Capital Expenditure), Sub-Head (15) Excise and State Excise, Sub-Sub-Head (15)(01) Major Works (Programme), Code 4059-1033

Cost Escalation Provision: 10% of Project Cost = ₹56,21,984

Contingency Provision: 4% of Essential Items (A) = ₹17,35,853.68

Green Building Compliance Provision: 5% of Essential Items (A) = ₹21,69,817.10

GST @ 12%: ₹67,46,380.64


COMPLIANCE & NEXT STEPS (Implied):

  1. Execution: Public Works Department (Building Section), Hingoli, to proceed with tender and construction
  2. Approval by Technical Authority: Noted as "Technically Approved for JAA (Joint Area Assessment)" by relevant PWD officer
  3. Audit Compliance: Comptroller and Auditor General (CAG) office to conduct financial and technical audit during and post-construction
  4. MoU Execution: Solar rooftop component contingent on formal MoU execution
  5. Progress Reporting: Implied quarterly/annual reporting to State Excise Commissioner and Finance Department

SUMMARY TABLE:

Particulars Amount (₹)
Essential Items (A) 43,396,342.00
Miscellaneous Items (B) 11,523,500.00
Optional Items (C) 1,300,000.00
Contingencies, Green Building, GST, Price Escalation (D) 15,300,630.00
TOTAL PROJECT COST ₹7,15,20,472.00
Say Seven Crores Fifteen Lakhs Twenty Thousand Four Hundred Seventy-Two rupees only

End of Analysis

मराठीत सारांश

थोडक्यात:
महाराष्ट्र सरकारने हिंगोली येथील उत्पादन शुल्क विभागाचे नवीन कार्यालय बांधण्यास मान्यता दिली आहे.

---

**विस्तृत समजावणी:**

**हे काय आहे?**
- हे एक सरकारी निर्णय (Government Resolution) आहे
- महाराष्ट्र सरकारचा गृह विभाग हा निर्णय दिला
- तारीख: 15 फेब्रुवारी 2021

**काय मंजूर झाले?**
- हिंगोली जिल्ह्यात उत्पादन शुल्क विभागाचे नवीन कार्यालय बांधणे
- या कार्यालयात दारूबंदी कायद्यासंबंधी काम होणार
- अधीक्षक (Superintendent) हा मुख्य अधिकारी असणार

**साधारण भाषेत:**
दारु, मद्य आणि उत्पादन शुल्कांचा पर्यवेक्षण करणाऱ्या सरकारी विभागाचा हिंगोली शहरात नवीन दफ्तर बनवण्याची मंजुरी मिळाली.

---

*यह GR सरकारी कार्यालय बांधकामाबद्दल आहे, दारूबंदी कायद्याचे नियम नाहीत.*

Original Document

Disclaimer: This page presents a research-grade plain-language summary of a Government of Maharashtra notification, generated by MyExcise's AI from the original government source. It is not a substitute for the original document or legal advice. Always verify the original PDF (linked above) before acting. MyExcise is a research and reference tool, not a law firm.