Link copied!
 Back
Home › GRs & Gazettes › अधीक्षक, राज्य उत्पादन शुल्क, भंडारा यांच्या प्रशासकीय इमारत...

अधीक्षक, राज्य उत्पादन शुल्क, भंडारा यांच्या प्रशासकीय इमारतीच्या बांधकामास प्रशासकीय मान्यता प्रदान करणेबाबत.

Reference
202106171827155529
Issued
17 Jun 2021
Source
GR Portal (Home Dept - State Excise)
Category
Gr Home Dept

What This Document Says

MAHARASHTRA EXCISE OFFICIAL DOCUMENT ANALYSIS

Document Type: Government Resolution (GR) – Administrative Sanction for Capital Works

Reference Number: BGT-1020/Pr.Cr.85/RAUSHU-1

Issued By: Government of Maharashtra, Home Department (गृह विभाग)

Effective Date: 17 June 2021

Portal ID: 1488 (Maharashtra Government Portal)

Digital Reference Code: 202106171827155529


SUMMARY

This Government Resolution grants administrative approval and financial sanction for the construction of an administrative building for the State Excise Department at Bhandar taluka, Bhandar district, Maharashtra. The project is sanctioned at a total cost of ₹8,46,82,000 (Eight crores forty-six lakhs eighty-two thousand rupees). The work is to be constructed on Nazul Sheet No. 35, Plot No. 4 (area 3,624 sq.mt.) and consists of a G+2 (Ground + 2 floors) administrative building. The project includes all associated civil, electrical, water supply, sanitary, and miscellaneous works as detailed in the attached recapitulation sheet. Funding is authorized from the current financial year 2021-22 budget under the Major Works programme (head 4059-1033).


KEY PROVISIONS

Administrative Sanction Details:

  • Sanctioned Cost: ₹8,46,82,000 (Eight crores forty-six lakhs eighty-two thousand rupees) — exact amount
  • Location: Nazul Sheet No. 35, Plot No. 4, Bhandar taluka, Bhandar district, Maharashtra
  • Land Area: 3,624 sq.mt. (square meters)
  • Building Type: Administrative Building for State Excise Department
  • Building Design: G+2 (Ground Floor + 1st Floor + 2nd Floor)
  • Authority Under Which Sanction Is Granted:

    • Financial Powers Regulations, 1978 — Part-I, Sub-section-5, Clause 1
    • Maharashtra Public Works Code — Section 134 — as per powers vested in Administrative Department
    • Budget Head for Fund Allocation:

      • Demand No.: H-8
      • Budget Head: 4059 – Public Works Capital Expenditure
      • Sub-head: (15) Prohibition & State Excise
      • Sub-sub-head: (15) (01) Major Works (Scheme) – Code 4059-1033 – Major Works
      • Budget Year: 2021-22 (Current Financial Year)
      • Funding Source: Available provision under this head for FY 2021-22
      • Building Components and Costs:

        1. ESSENTIAL ITEMS:

        Component Area/Quantity Unit Rate Total Cost (₹)
        (a) Building Proper (Built-up Area)
        Basement 0.00 Sq.mt 0.00
        Stilt Floor 0.00 Sq.mt 0.00
        Ground Floor (Administrative Building G+2) 348.24 Sq.mt ₹35,048 Per Sq.mt 12,205,221.00
        1st Floor 407.93 Sq.mt ₹28,080 Per Sq.mt 11,454,618.00
        2nd Floor 407.93 Sq.mt ₹29,484 Per Sq.mt 12,027,349.00
        Foundation in B.C./Weak Soil 0.00 Sq.mt 0.00
        Total Built-up Area: 1,164.10 Sq.mt 35,687,188.00
        (b) Rain/Roof Water Harvesting Lump Sum 500,000.00
        (c) Ramp for Handicaps Lump Sum 500,000.00
        (d) Office Furniture Lump Sum 1,500,000.00
        Sub-Total (Essential Items): 42,507,683.00

        2. WATER SUPPLY AND SANITARY WORKS:

        Item Quantity Unit Rate Total Cost (₹)
        Internal (5% of Building Cost) 1,784,359.00
        External (6% of Building Cost) 2,141,231.00
        Sub-Total (Water Supply & Sanitary Works): 3,925,590.00

        3. ELECTRICAL WORKS:

        Item Specification Total Cost (₹)
        (a) External Electrification 6% of Building Cost 2,550,461.00
        (b) Other Electrical Items:
        Generator 5 KVA Capacity 1,000,000.00
        Fire Fighting Arrangement Lump Sum 1,200,000.00
        Supply Charges Lump Sum 1,200,000.00
        External Arc Lighting 10 KX System 540,000.00
        Renewable Energy/Solar Energy System Lump Sum 200,000.00
        Air Conditioning/Central Cooling Sub-Station etc. 500,000.00
        Transformer/Electric Sub-Station Lump Sum 2,000,000.00
        CCTV (Special Item) Lump Sum 2,800,100.00
        Sub-Total (Other Electrical Items): 9,440,100.00
        Sub-Total (Electrical Works 3a + 3b): 11,990,561.00

        4. MISCELLANEOUS ITEMS:

मराठी अनुवाद (Marathi Translation)
गृह विभाग) संडीप ढाकणे),

Sign in to continue reading

15 days of full content access — every Act, Rule, Regulation, GR, notification and Ex-DC-authored guide. No card required.
पूर्ण मजकूर पाहण्यासाठी साइन इन करा

Sign in with Google Already have an account? Sign in

मराठीत सारांश

**थोडक्यात:** भंडारा जिल्ह्यातील उत्पादन शुल्क विभागाच्या अधीक्षकांसाठी नवीन प्रशासकीय इमारत बांधण्याला सरकारची मान्यता दिली गेली.

---

**विस्तृत माहिती:**

• **काय मंजूर झाले?** भंडारा शहरात State Excise Department (उत्पादन शुल्क विभाग) च्या अधीक्षकांची नवीन administrative building (प्रशासकीय इमारत) बांधण्याला सरकारी मान्यता मिळाली.

• **कोण निर्णय घेतला?** गृह विभाग (Home Department) यांनी हा आदेश जारी केला.

• **केव्हा?** 17 जून 2021 रोजी.

• **कसे काम करते?** अधीक्षक यांचे कार्यालय आणि स्टाफ यांच्यासाठी आधुनिक आणि सुविधाजनक इमारत बांधली जाणार. यातून excise department चे काम चांगले व्हायचे.

• **भंडारा क्षेत्रातील उत्पादन शुल्क कार्यालयाचे प्रशासन (दारू, लायसन्स, शुल्क वसुली वगैरे) अधिक व्यवस्थित होणार.**

हा निर्णय शासकीय आवश्यकतेवर आधारित आहे.

Original Document

Share: WhatsApp
Disclaimer: This page presents a research-grade plain-language summary of a Government of Maharashtra notification, generated by MyExcise's AI from the original government source. It is not a substitute for the original document or legal advice. Always verify the original PDF (linked above) before acting. MyExcise is a research and reference tool, not a law firm.
Link copied to clipboard!
Ask MyExcise AI MyExcise AI