Link copied!
 Back
Home › GRs & Gazettes › महाराष्ट्र दारुबंदी कायदा, 1949 नुसार नमुना-I, पीएलएल व सीएल...

महाराष्ट्र दारुबंदी कायदा, 1949 नुसार नमुना-I, पीएलएल व सीएल-1 (मळीव्यतिरिक्त) व बीआरएल अनुज्ञप्ती (वाईनरी व मायक्रोब्रुअरी वगळून) मंजूर करण्याआधी इरादापत्र मंजूर करणे व त्यास मुदतवाढ देण्याबाबतची कार्यपद्धती.

Reference
202111081523000229
Issued
08 Nov 2021
Source
GR Portal (Home Dept - State Excise)
Category
Gr Home Dept

What This Document Says

MAHARASHTRA EXCISE DEPARTMENT — GOVERNMENT RESOLUTION ANALYSIS

Document Type: Government Resolution (Shaasan Narnay) — Policy Directive on Intent Letters (Iradapatra) and Extensions

Reference Number: एमपीएल-0921/प्र.क्र.166/राउशु-3 [MPL-0921/PR.KR.166/RAUSHU-3]
Issued By: Government of Maharashtra, Home Department (Griha Vibhag)
Effective Date: 8 November 2021 (तदनांक:- 8 नोव्हेंबर, 2021)
Portal ID: 1516


SUMMARY

This Government Resolution establishes a formal procedure for granting and extending Intent Letters (Iradapatra) for applicants seeking manufacturing licenses under the Bombay Prohibition Act 1949. Previously, intent letters were granted free of charge without time-bound implementation or renewal requirements. This GR introduces: (1) mandatory intent letter stage before final license issuance; (2) fees of ₹2 lakh for initial intent letter, ₹3 lakh for first extension, ₹5 lakh for final extension; (3) fixed timelines (3 years initial + 2 years + 1 year maximum); (4) stricter documentation and vetting requirements; (5) automatic cancellation if project not completed within stipulated period. Applies to Model-I, PLL, CL-I, and BRL (Brewery) licenses, excluding Winery and Microbrewery.


KEY PROVISIONS

A. APPLICABILITY & LICENSE TYPES

  • Applicable License Types:

    • নমুना-I (Model-I / Sample-I)
    • PLL (Pegged Liquor License)
    • CL-I (Country Liquor Class-I) — excluding Toddy/Malt liquor (मळीव्यतितरक्ि)
    • BRL (Brewery License) — excluding Winery and Microbrewery (वाईनरी व मायक्रोब्रुअरी वगळून)
    • Exclusions: Winery licenses and Microbrewery licenses are NOT subject to this procedure


      B. MANDATORY INTENT LETTER (IRADAPATRA) STAGE

      अ) Primary Requirement:

      • Before granting final manufacturing license (नमुना-I/पीएलएल/सीएल-1/बीआरएल), the applicant MUST first obtain a formal Intent Letter (प्रथम शाश्विी म्हणून इरादापत्र) from the Government
      • Intent Letter is a prerequisite to final license issuance
      • Intent Letter is NON-TRANSFERABLE without prior Government permission (except as detailed below)

      • C. DOCUMENTS REQUIRED WITH INTENT LETTER APPLICATION

        आ) Mandatory Enclosures (सादर करणे आवश्यक कागदपत्रे):

        1. Land Ownership/Lease Documentation:

          • Proof of ownership (if land is applicant's own property), OR
          • Registered lease deed (if land is leased/rented)
          • Environmental Clearance:

            • Consent to Establish (CTE) certificate from Maharashtra Pollution Control Board (महाराष्ट्र प्रदुर्षण तनयंत्रण मंडळ)
            • Company Registration:

              • Certificate of registration/incorporation extract from Company Registrar (if private company) OR partnership registration certificate (if partnership firm)
              • Management Details & Memorandum:

                • If Applicant is Private Company: Copy of Memorandum & Articles of Association (मेमोरॅन्डम एन्ड आटीकल्स ऑफ असोतसएशन)
                • If Applicant is Partnership Firm: Copy of registered partnership deed (नोंदणीकृ ि भागीदारी पत्र)
                • Complete details of all Directors/Partners: Full name, age, postal address, PAN card number, etc.
                • Income-Tax / Sales-Tax Clearance:

                  • If applicant has prior business history:
                    • Certificate / Affidavit / Self-Declaration from Income Tax Department / Sales Tax Department certifying NO OUTSTANDING ARREARS (थकबाकी नसल्याबाबि प्रमाणपत्र / प्रतिज्ञापत्र / स्वयंघोर्षणापत्र)
                    • Character Verification Report:

                      • Background/Character verification report for all Directors/Partners
                      • Exception: NOT required for Cooperative Societies/Institutions (सहकारी संस्था वगळून)

                      • D. TIMELINE & VALIDITY PERIOD

                        इ) Initial Intent Letter Period:

                        • Total Construction Period: 3 years (तीन वर्ष)
                        • Applicant must complete 100% project construction within this 3-year window
                        • Only after 100% construction AND fulfillment of all other requirements can the final license be issued

                        • E. EXTENSION PROVISIONS & FEES

                          ई) First Extension:

                          • If project NOT completed within initial 3 years, applicant may apply for extension
                          • Fee for First Extension: ₹3,00,000 (तीन लाख रुपये)
                          • Extension Period Granted: 2 additional years (2 वर्षांची मुदिवाढ)
                          • Must be applied at least 2 months BEFORE the initial 3-year period expires (मुदि संपण्यापूवी 2 मतहन्याच्या आि सादर करणे बंधनकारक)
                          • Final/Ultimate Extension:

                            • If project still NOT completed after 2-year first extension (i.e., after total 5 years), applicant may apply for FINAL extension
                            • Fee for Final Extension: ₹5,00,000 (पाच लाख रुपये)
                            • Final Extension Period Granted: 1 additional year ONLY (1 वर्षाची अंतिम मुदिवाढ)
                            • Total Maximum Period: 3 years (initial) + 2 years (first extension) + 1 year (final extension) = 6 years maximum
मराठी अनुवाद (Marathi Translation)
एमपीएल-0921/प्र.क्र.166/राउशु-3 [ तदनांक:- 8 नोव्हेंबर, 2021) ना- मळीव्यतितरक्ि) वाईनरी व मायक्रोब्रुअरी वगळून) अ) नमुना- पीएलएल/सीएल-1/बीआरएल), प्रथम शाश्विी म्हणून इरादापत्र) आ) सादर करणे आवश्यक कागदपत्रे): महाराष्ट्र प्रदुर्षण तनयंत्रण मंडळ) मेमोर...

Sign in to continue reading

15 days of full content access — every Act, Rule, Regulation, GR, notification and Ex-DC-authored guide. No card required.
पूर्ण मजकूर पाहण्यासाठी साइन इन करा

Sign in with Google Already have an account? Sign in

मराठीत सारांश

**थोडक्यात:**
या notification नुसार दारूचे licence (PLL, CL-1, BRL) घेण्याआधी एक "intent letter" (इरादापत्र) मंजूर करावे लागणार आहे. हा नियम winery आणि microbrewery साठी लागू नाही.

---

**विस्तृत समजावून सांगा:**

**कोण प्रभावित होते?**
- ज्यांना **PLL** (Prestige Liquor Licence) घायचे
- ज्यांना **CL-1** (कंट्री लिकर-1, मोलॅसिस वगळता) घायचे
- ज्यांना **BRL** (Brewery Licence) घायचे

---

**नया प्रक्रिया:**

१. **पहिली पायरी:** तुमचा इरादापत्र (intent letter) पहिले मंजूर होवे लागेल
- हा letter लिहा की तुम्हाला दारूचा licence घायचा आहे

२. **दुसरी पायरी:** इरादापत्र मंजूर झाल्यानंतर, त्यानंतर असली licence साठी application द्या

३. **Winery व Microbrewery:** या दोघांना हा नियम लागू नाही — त्यांना सरळ licence मिळू शकतो

---

**मुदतवाढ:** Intent letter ची मुदतवाढ देण्याची प्रक्रियाही या notification मध्ये दिली आहे.

---

**कधून लागू?** 08 नोव्हेंबर 2021 पासून

Original Document

Share: WhatsApp
Disclaimer: This page presents a research-grade plain-language summary of a Government of Maharashtra notification, generated by MyExcise's AI from the original government source. It is not a substitute for the original document or legal advice. Always verify the original PDF (linked above) before acting. MyExcise is a research and reference tool, not a law firm.
Link copied to clipboard!
Ask MyExcise AI MyExcise AI