अधीक्षक, राज्य उत्पादन शुल्क, सोलापूर कार्यालयाच्या कार्यालयीन इमारतीच्या बांधकामास प्रशासकीय मान्यता प्रदान करणेबाबत.

Reference
202111151552138929
Issued
15 Nov 2021
Source
GR Portal (Home Dept - State Excise)
Category
Gr Home Dept

What This Document Says

MAHARASHTRA EXCISE DEPARTMENT — DOCUMENT ANALYSIS

Document Type: Government Resolution (GR) — Administrative Sanction for Capital Works

Reference Number: GR No. BJT-1021/Pr.Cr.53/RAUSHU-1, dated 15 November 2021

Issued By: Home Department (गृह विभाग), Government of Maharashtra

Effective Date: 15 November 2021

Digital Reference Code: 202111151552138929


SUMMARY

This Government Resolution grants administrative sanction for the construction of a new office building for the Superintendent of State Excise (अधीक्षक, राज्य उत्पादन शुल्क), Solapur. The project involves construction of a stilt + G+2 storey administrative building on Plot No. 145/A, Railway Line, Solapur, spanning 3,597.12 square meters. The total project cost is sanctioned at ₹15,93,45,974 (Fifteen Crore Ninety-Three Lakh Forty-Five Thousand Nine Hundred Seventy-Four only). The sanction is issued following approval from the High-Power Committee chaired by the Chief Secretary, and with concurrence from the Public Works Department and Finance Department.


KEY PROVISIONS

Project Details

  • Beneficiary: Superintendent, State Excise Department, Solapur
  • Location: Plot No. 145/A, Railway Line, Solapur
  • Land Area: 3,597.12 square meters
  • Building Specification: Stilt + Ground Floor + 2 Storeys (Stilt + G+2)
  • Built-Up Area: 3,597.12 Sq. Mtrs
  • Financial Sanction

    • Total Project Cost (TPC): ₹15,93,45,974 (Fifteen Crore Ninety-Three Lakh Forty-Five Thousand Nine Hundred Seventy-Four)
    • This comprises:
      • Essential Items (Building & Components): ₹1,12,30,78,32
      • Miscellaneous Items: ₹10,89,10,40
      • Optional Items: ₹47,00,000
      • Provisions (Contingencies, GST, Price Escalation): ₹31,44,71,02
      • Cost Breakdown (Component-wise)

        Sr. No. Particulars Unit Rate/Norm Amount (₹)
        1(a) Building Proper (Built-Up Area) 3,597.12 Sq.M ₹23,000 per Sq.M 8,27,33,760
        1(b) Fuel Gas Pipeline — — 0
        1(c) Bio-Diesel — — 0
        1(d) Rain/Roof Water Harvesting LS — 5,00,000
        1(e) Solar Rooftop (MOU execution) — — 0
        1(f) Ramp for Handicaps LS — 30,000
        1(g) Furniture (2,161 Sq.M @ 70% of 3,087.62) — ₹5,000 per Sq.M 1,08,06,670
        Subtotal Essential Items (A) — — — ₹11,23,36,670
        2 Water Supply & Sanitary Works 5% of (1a) — ₹41,36,688
        3(a) Electrification (Internal) 5% of (1a) — ₹41,36,688
        3(b) Electrification (External) 6% of (1a) — ₹49,64,026
        3(c) Fire Fighting Arrangements etc. LS — ₹50,00,000
        Subtotal Item 2 & 3 — — — ₹1,41,00,714
        Subtotal (A) — — — ₹1,12,30,78,32
        MISCELLANEOUS ITEMS (B) — — — —
        (i) Compound Wall & Gate 471.91 Rmt ₹8,000 per Rmt ₹37,75,280
        (ii) Internal Roads 776.97 Rmt ₹8,000 per Rmt ₹62,15,760
        (iii) Development of Ground, Horticulture — — 0
        (iv) Parking LS — ₹5,00,000
        (v) Retaining Wall — — 0
        (vi) Landscaping LS — ₹2,00,000
        (vii) Soil Investigations & Detail Land Survey LS — 0
        (viii) CC Drains and CI Works LS — 0
        (ix) Dismantling of Old Building LS — ₹2,00,000
        Subtotal (B) — — — ₹1,08,91,040
        OPTIONAL ITEMS (C) — — — —
        1 Underground Water Tank for R/W Harvesting Cu.M — ₹5,00,000
        2 Water Main Storage, Pumphouse, Borewell — — ₹5,00,000
        3 Air Conditioning — — 0
        4 Lifts — — ₹20,00,000
        5 External Toilets — — ₹2,00,000
        6 AB Room, Area Lighting, Pumps, Generator — — ₹10,00,000
        7 CCTV — — ₹5,00,000
        8 Gardening/Plantation of Trees — — 0
        Subtotal (C) — — — ₹47,00,000
        Project Cost (A+B+C) — — — ₹1,27,89,89,872
        PROVISIONS (D) — — — —
        (i) Contingencies @ 4% on (A) — — ₹33,09,350
        (ii) GST @ 12% on (A+B+C) — — ₹1,53,47,865
        (iii) Price Escalation @ 10% on Project Cost (P) — — ₹12,78,98,872
        Subtotal (D) — — — ₹31,44,71,102
        TOTAL COST OF PROJECT (A+B+C+D) — — — ₹1,59,34,59,974

        In words: Fifteen Crore Ninety-Three Lakh Forty-Five Thousand Nine Hundred Seventy-Four rupees only.

मराठी अनुवाद (Marathi Translation)
गृह विभाग), अधीक्षक, राज्य उत्पादन शुल्क), प्रत्)

Sign in to continue reading

15 days of full content access — every Act, Rule, Regulation, GR, notification and Ex-DC-authored guide. No card required.
पूर्ण मजकूर पाहण्यासाठी साइन इन करा

Sign in with Google Already have an account? Sign in

मराठीत सारांश

**थोडक्यात:** सोलापूर येथील उत्पादन शुल्क विभागाचे कार्यालय भवन बांधण्यास सरकारी मान्यता मिळाली.

---

**काय झालं?**

महाराष्ट्र सरकारच्या गृह विभागाने (15 नोव्हेंबर 2021) सोलापूर शहरात उत्पादन शुल्क विभागाचे नवीन कार्यालय भवन बांधण्यास **प्रशासकीय मान्यता** (Administrative Approval) दिली.

**याचा अर्थ:**

• सोलापूर येथील **Excise Department** (दारूबंदी, तंबाखू, अन्य उत्पादन शुल्कावरील नियंत्रण करणारा विभाग) यांच्यासाठी नवीन कार्यालय इमारत बांधणी मंजूर झाली

• या इमारतीसाठी सरकारने **आर्थिक तरतूद** (बजेट) मंजूर केलं असावे

• आता या विभागाचे अधीक्षक यांना हे बांधकाम सुरू करण्याचा अधिकार मिळाला

**साधारण नागरिकांसाठी:** हा सरकारचा आंतरिक प्रशासनिक निर्णय आहे. यामुळे तुमच्या लाइसन्स किंवा परमिटमध्ये कोणताही बदल होणार नाही.

Original Document

Share: WhatsApp
Disclaimer: This page presents a research-grade plain-language summary of a Government of Maharashtra notification, generated by MyExcise's AI from the original government source. It is not a substitute for the original document or legal advice. Always verify the original PDF (linked above) before acting. MyExcise is a research and reference tool, not a law firm.