पुणे जिल्हयाच्या राज्य उत्पादन शुल्क विभागाच्या प्रशासकीय इमारतीचे बांधकामास प्रशासकीय मान्यता प्रदान करणेबाबत.

Reference
202112171736569329
Issued
17 Dec 2021
Source
GR Portal (Home Dept - State Excise)
Category
Gr Home Dept

What This Document Says

MAHARASHTRA EXCISE DEPARTMENT — GOVERNMENT RESOLUTION ANALYSIS

Document Type: Government Resolution (GR) — Administrative Approval for Capital Works

Reference Number: GR No. BBT-1021/Pr.Cr.276(1)/RAAUSHU-1

Issued By: Government of Maharashtra, Home Department (गृह विभाग), Ministry, Mumbai 400 032

Date of Issue: 17 December 2021

Effective Date: From date of publication (as per digital signature authentication)

Website Reference: www.maharashtra.gov.in | Digital Portal ID: 202112171736569329


SUMMARY

This Government Resolution grants administrative approval for the construction of a State Excise Department administrative office building in Pune District. The approved building will be constructed at City Survey No. 32, Wellesley Road, Pune, in the name of the State Excise Department. The total approved project cost is ₹30.65 crore (Thirty Crore Sixty-Five Lakh rupees only). The project comprises a B+G+9 storey building with a built-up area of 16,003.65 sq.m and includes both essential and optional components. The approval is conditional upon compliance with specified terms and is issued in accordance with decisions made by the Chief Secretary-chaired High-Level Committee on 29.11.2021 and departmental concurrence from Public Works Department and Finance Department.


KEY PROVISIONS

I. APPROVED PROJECT SCOPE AND COST

  • Location: City Survey No. 32, Wellesley Road, Pune (on property in the name of State Excise Department)
  • Project Description: Administrative Office Building (B+G+9 Storeys)
  • Built-Up Area: 16,003.65 sq.m
  • Total Approved Cost: ₹30,65,50,820 (Thirty Crore Sixty-Five Lakh Fifty Thousand Eight Hundred Twenty rupees)
  • II. COST COMPONENT BREAKDOWN

    (A) ESSENTIAL ITEMS/COMPONENTS:

    Component Quantity Unit Rate Cost (₹)
    Building Proper (B+G+9 Floors) 16,003.65 26,000 per sq.m 41,60,94,900
    Sub-Total (A) — — 41,60,94,900
    Furniture 3,904 units @ 70% of 5,576.64 ₹5,000 per unit 1,95,20,000
    Water Supply & Sanitary Works — 5% of (A) 78,04,745
    Electrification — Internal — 5% of (A) 78,04,745
    Electrification — External — 6% of (A) 93,65,694
    Fire Fighting Arrangements — Lump Sum 50,00,000
    Sub-Total (Essential Items) — — 2,05,99,084

    (B) MISCELLANEOUS ITEMS:

    Item Quantity Unit Rate Cost (₹)
    Compound Wall & Gate 121 Rmt ₹8,000 per Rmt 9,68,000
    Internal Roads 285 Rmt ₹5,000 per Rmt 14,25,000
    Development of Ground, Horticulture — Lump Sum 5,00,000
    Landscaping — Lump Sum 2,00,000
    Soil Investigations & Detail Land Survey — Lump Sum 1,00,000
    Sub-Total (B) — — 31,93,000

    (C) OPTIONAL ITEMS (Approved for future execution if funds available):

    Item Cost (₹)
    Underground Water Tank for Rainwater Harvesting —
    Water Main Storage, Pumphouse, Borewell —
    Air Conditioning System 2,00,00,000
    Lifts 80,00,000
    External Toilets —
    AB Room, Area Lighting, Pumps, Generator —
    CCTV System 50,00,000
    Sub-Total (C) 3,30,00,000

    (D) PROVISIONS (Contingencies & Other Charges):

    Provision Calculation Cost (₹)
    Contingencies 4% on (A) 62,43,796
    GST (Goods and Services Tax) 12% on Project Cost 2,90,61,970
    Price Escalation 10% on Project Cost 24,21,83,084
    Labour Insurance 0.5% on Project Cost 12,10,915
    Consultancy Charges 1.5% on Project Cost 36,32,746
    Sub-Total (D) — 6,43,67,735.2

    III. TOTAL PROJECT COST SUMMARY

    Category Cost (₹)
    Essential Items (A) 41,60,94,900
    Miscellaneous Items (B) 31,93,000
    Contingencies & Charges 6,43,67,735.2
    TOTAL PROJECT COST (TPC) ₹30,65,50,820
    Expressed in Crores ₹30.65 Crore
    Expressed in Lakhs ₹3,065.51 Lakhs

    IV. UNIT RATES (PLINTH AREA RATES)

    Description Rate
    Building Proper Cost ₹26,000 per sq.m
    Electrification Work ₹3,693 per sq.m
    Water Supply ₹1,300 per sq.m
    Combined Rate (i+ii+iii) ₹30,993 per sq.m
    Total Project Cost per sq.m ₹5,106 per sq.m

    V. CONDITIONS OF APPROVAL

    Condition (अ) — Built-up Area Verification:

    The Commissioner of State Excise must certify that the gross built-up area of the proposed building conforms to permissible norms prescribed for staff accommodation.

मराठी अनुवाद (Marathi Translation)
गृह विभाग), अ) —

Sign in to continue reading

15 days of full content access — every Act, Rule, Regulation, GR, notification and Ex-DC-authored guide. No card required.
पूर्ण मजकूर पाहण्यासाठी साइन इन करा

Sign in with Google Already have an account? Sign in

मराठीत सारांश

**थोडक्यात:**
पुणे जिल्ह्यात उत्पादन शुल्क विभागाची नवीन प्रशासकीय इमारत बांधण्याची सरकारी मान्यता दिली गेली.

---

**तपशील:**

**काय मंजूर झाले?**
- पुणे जिल्ह्यात Excise Department (उत्पादन शुल्क विभाग) साठी नवीन office building बांधण्याची योजना मंजूर झाली
- हे सरकारी notification (GR) आहे — महत्वाचा अधिकृत आदेश

**केव्हा आणि कोणीकडून?**
- घोषणा: १७ डिसेंबर २०२१
- गृह विभाग (Home Department) ने यो मंजूरी दिली

**व्यावहारिक अर्थ:**
- उत्पादन शुल्क विभागाला आता पुणे जिल्ह्यात आपली स्वतःची नवीन इमारत बांधता येईल
- पाहिजे तितके fund आणि प्रशासकीय अनुमती मिळाली
- दारू license, permit, tax संबंधित काम या नव्या office मधून होईल

**कोण लाभान्वित?**
- Excise Department कर्मचारी
- पुणे जिल्ह्यातील दारू business संबंधित citizens (license applications वगैरे)

Original Document

Share: WhatsApp
Disclaimer: This page presents a research-grade plain-language summary of a Government of Maharashtra notification, generated by MyExcise's AI from the original government source. It is not a substitute for the original document or legal advice. Always verify the original PDF (linked above) before acting. MyExcise is a research and reference tool, not a law firm.