Link copied!
 Back
Home › GRs & Gazettes › जलरहित मद्यार्क (इथेनॉल) निर्मितीकरिता दुहेरी स्त्रोत (Dual-...

जलरहित मद्यार्क (इथेनॉल) निर्मितीकरिता दुहेरी स्त्रोत (Dual-Feed) धोरण.

Reference
202507231819263829
Issued
23 Jul 2025
Source
GR Portal (Home Dept - State Excise)
Category
Gr Home Dept

What This Document Says

Gazette Reference: GR Number 202507231819263829, dated 23 July 2025
Type: Policy — Dual-Feed Ethanol Production
Authority: Maharashtra Prohibition Act, 1949; Government Resolution under Home Department (State Excise)
Summary: The Maharashtra Government has approved a dual-feed policy permitting molasses-based distillery units holding Form-I (Manufacturing) licenses to produce anhydrous ethanol (denatured alcohol) from both traditional feedstock (sugar/molasses/bagasse/cane juice) and grain simultaneously, in line with the Central Government's Ethanol Blending Programme (EBP) to increase fuel ethanol blending ratios in petrol and diesel.


KEY POLICY PROVISIONS

1. Eligible Units & Feedstock Combination

  • Licensees: Form-I licensed molasses-based distillery units only
  • Permissible dual feedstock sources:
    • Sugar / Sugarcane juice / B-heavy molasses / C-heavy molasses (traditional)
    • PLUS Grain (cereals) — new addition
    • Product restriction: Ethanol produced from grain feedstock shall be used only for anhydrous ethanol (industrial/fuel use) — NOT for beverage alcohol

    • 2. Prerequisites for Approval

      Applicant distilleries must obtain and furnish the following clearances/documentation before commencing dual-feed production:

      1. Environmental Clearance (EC) — Revised certificate from Ministry of Environment (Central Govt)
      2. Consent to Operate (CTO) — Revised certificate from Maharashtra Pollution Control Board (MPCB)
      3. PESO Approval — Statutory clearance for structural/layout modifications from the Petroleum Safety Authority
      4. Established Capacity Plan — Approved layout drawings showing current molasses-based distillery capacity, existing tanks, and infrastructure
      5. Proposed Capacity Plan — If capacity expansion or structural changes are required, revised layout drawings must be submitted

      6. 3. Mandatory Technical Infrastructure Requirements

Sign in to continue reading

15 days of full content access — every Act, Rule, Regulation, GR, notification and Ex-DC-authored guide. No card required.
पूर्ण मजकूर पाहण्यासाठी साइन इन करा

Sign in with Google Already have an account? Sign in

Original Document

Share: WhatsApp
Disclaimer: This page presents a research-grade plain-language summary of a Government of Maharashtra notification, generated by MyExcise's AI from the original government source. It is not a substitute for the original document or legal advice. Always verify the original PDF (linked above) before acting. MyExcise is a research and reference tool, not a law firm.
Link copied to clipboard!
Ask MyExcise AI MyExcise AI